👨‍🔧 Jaenal A

Detail Beban Kerja Teknisi

Export Excel
TOTAL JOB
39
Total pekerjaan
TOTAL JAM
213.50
Jam kerja teknisi
AVG DURASI
5.47
Rata-rata pekerjaan
FTE
1.55
OVERLOAD

📋 History Pekerjaan Teknisi

No Tanggal Jenis Mesin Area Durasi Keterangan
1 2026-05-31 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Lembur Otomatis
2 2026-05-29 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
3 2026-05-29 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
4 2026-05-28 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
5 2026-05-27 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
6 2026-05-27 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
7 2026-05-26 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
8 2026-05-25 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
9 2026-05-25 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
10 2026-05-24 Perbaikan Maintenance Mesin MWH, Capping, Blister, Washing dan Oven Xufa Injeksi 6.50 Jam Lembur Otomatis
11 2026-05-23 Perbaikan Maintenance Mesin MWH, Capping, Blister, Washing dan Oven Xufa Injeksi 6.50 Jam Lembur Otomatis
12 2026-05-23 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Lembur Otomatis
13 2026-05-22 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
14 2026-05-21 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
15 2026-05-21 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
16 2026-05-20 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
17 2026-05-19 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
18 2026-05-19 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
19 2026-05-18 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
20 2026-05-17 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Lembur Otomatis
21 2026-05-15 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
22 2026-05-15 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
23 2026-05-14 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
24 2026-05-13 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
25 2026-05-13 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
26 2026-05-12 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
27 2026-05-11 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
28 2026-05-11 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
29 2026-05-09 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Lembur Otomatis
30 2026-05-08 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
31 2026-05-07 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
32 2026-05-07 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
33 2026-05-06 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
34 2026-05-05 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
35 2026-05-05 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana
36 2026-05-04 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
37 2026-05-03 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Lembur Otomatis
38 2026-05-01 Perbaikan MTC Climatic Chamber, Magnifer Lamp, LAF, Cabinet LAF, LAF Portable, Air Shower, Passoxdinamis, Mixing Tank, Filling, Blistering, Dry Fog Minncare, Labelling, Filling Produksi 6.50 Jam Jadwal Terencana
39 2026-05-01 Perbaikan PIket support produksi implat/ tablet/ packing Semua Area 4.00 Jam Jadwal Terencana